Road Reconstruction: Stafford Third Line and Sawmill Road - This event has already occurred
Event Details:
Approximately 2.7 km of roadway will be reconstructed including Stafford Third Line from Saar’s Lane to Highway 41 and Sawmill Road from Stafford Third Line to Highway 41. This project is scheduled to start August 9th until September 3rd.
The project involves the reconstruction of the roadway and ditching improvements which includes the following works:
- Stripping of asphalt road surface
- Replacement of granular road base materials
- Placement of geo-synthetic products
- Culvert replacements
- Ditching works where required
- Repaving of the roadway
- Shouldering of the new roadway
During this time, we ask that you please obey:
- All signage in the designated work area
- Traffic Control Persons when travelling through the work site
- Vehicles and equipment within the work site
The Municipality is committed to working with you to help alleviate the impact of the construction on your daily activities. Every effort will be made to minimize any inconveniences to you. If you need to drive through the construction zone, please allow additional commuting time.
The work will be completed by Township Operations Staff, as well as contracted services from Greenwood Paving, G.P. Splinter and R.G.T. Clouthier Construction.Thank you for your assistance while we work to improve the Township of Laurentian Valley.
Feature Image:
Stafford Third Line & Sawmill Road updated.jpgContact
Title
Date: Date
Location: Location
Category: Category
Location: Location
Category: Category
Where urban amenities meet outdoor rural fun.
LV is home to easy comfortable living.